Level 2 charger installation - dedicated circuit, permit filing, and inspection included
Panel upgrades available - if your panel can't support a charger, we handle that too
Based in Dracut - licensed master electricians, no subcontractors

Licensed & Insured
Google Guaranteed
Trusted Since 1979
Locally-Owned
Dedicated 240V/50A circuit and hardwired or outlet-based Level 2 EVSE installation for any electrical vehicle brand.
New dedicated circuit run from your electrical panel to the charger location, sized correctly for continuous load per NEC 625.
Weatherproof installation at exterior walls, detached garages, and driveways rated for New England winters.
If your panel is full or running 100A service, we upgrade to 200A and install the charger in the same visit.
Installation of Tesla Wall Connectors for Tesla vehicles, and adapter-compatible setup for non-Tesla EVs.
Designing and wiring charging setups for households with two or more electric vehicles.





Sylvester Electric has been serving Dracut and Greater Lowell for over 45 years. Licensed master electricians on every job -no subcontractors, no shortcuts.
We give you a firm estimate before any work begins. If your panel needs an upgrade first, we'll tell you upfront - and we can handle both in a single visit.
Sylvester Electric is headquartered on Bridge Street. We file permits with the Town of Dracut Building Department every week and coordinate the required inspection - you don't have to do a thing.
Free estimate at your Dracut home
A licensed Sylvester Electric technician visits your home, assesses your electrical panel's available capacity, looks at the best route for the circuit run, and discusses charger placement options. This visit is free and comes with no obligation. We'll tell you exactly what the job involves and what it will cost before any work is scheduled.
Panel capacity check & load calculation
A Level 2 charger requires a dedicated 40–50 amp, 240V circuit. We perform a NEC load calculation to verify your panel can handle the additional demand. If your current panel is full or running 100A service, we'll recommend the right upgrade path — and give you a combined quote for both the panel upgrade and charger installation in one job.
Permit filing with the Town of Dracut
We file the electrical permit with the Town of Dracut Building Department on your behalf. All EV charger installations in Dracut require an electrical permit and inspection — we handle all of this, and your installation won't begin until the permit is in hand.
Installation day
Our electricians run the dedicated circuit, install the breaker, mount the charger, and make all connections. We work cleanly, use conduit where required, and leave the workspace tidy. Most standard installs are done in 2–4 hours. Jobs that include a panel upgrade take a full day.
Testing & inspection
We test the charger fully before we leave — verifying the circuit, the breaker, and the charger's operation. We then coordinate the required inspection with the Town of Dracut. Once the inspection passes, your installation is complete and code-compliant.
Rebate documentation
We provide all the documentation you need — the permit, the inspection sign-off, and the installation records — to file for your Eversource rebate and federal tax credit. We'll walk you through which programs you qualify for and what to submit.
Yes. Dracut requires an electrical permit for any Level 2 EV charger installation. Sylvester Electric handles the permit filing with the Town of Dracut Building Department and coordinates the required inspection. You don't need to do anything — we take care of it from start to finish.
Not always. A Level 2 charger typically requires a dedicated 40–50 amp, 240V circuit. If your panel has open slots and available capacity, no upgrade is needed. If your panel is full, you're running older 100-amp service, or you have other high-load appliances planned (like a heat pump or electric range), a panel upgrade may be required. Sylvester Electric checks this during the free estimate at no charge — you'll know exactly where you stand before committing to anything.
We install all major Level 2 charger brands: ChargePoint, Enel X JuiceBox, Tesla Wall Connector (including non-Tesla vehicles using the standard adapter), Grizzl-E, and others. We can also install customer-supplied units. If you're not sure which charger to buy, we'll give you our honest recommendation based on your vehicle, your home setup, and whether you want smart charging features for your power company's off-peak programs
Yes. We install weatherproof outdoor EV chargers at garages, exterior walls, and driveways throughout Dracut. Outdoor installations use NEMA 3R or 4X rated enclosures and weatherproof conduit designed to hold up through Massachusetts winters. We'll assess the best location during your free estimate.
Most straightforward installs, assuming the panel has capacity and charger going in a garage close to the panel will take 2–4 hours. Longer wiring runs, outdoor installations, or jobs that include a panel upgrade may take a full day. We'll give you a clear time estimate before any work begins.
Level 1 charging uses a standard 120V outlet and adds roughly 4–5 miles of range per hour — fine for plug-in hybrids or very low daily mileage, but too slow for most full EV drivers. Level 2 charging uses a dedicated 240V circuit and adds about 25 miles of range per hour, fully charging most EVs overnight. For any Dracut homeowner who drives more than 30–40 miles a day, Level 2 is the practical choice.
Panel & Service upgrades (100A to 400A) - support EV Chargers, heat pumps, home additions & more
🏠 Standby Generator Installation
Whole-home generator hookup with transfer switch. Be ready for the next outage.
Safe removal and replacement of Knob & Tube wiring found in older Wilmington homes.
🔧 Other Electrical Services
Troubleshooting, breaker replacement, outlets, wiring issues.
Master Electricians
Code Certified
Established 1979
Locally Owned